A platform for research: civil engineering, architecture and urbanism
Remarkable work at taikoo dockyard
Salvage, repairs and building, and joining up of S. S. Tijileboet near fore end; cut vessel through fore cross bunker and salved after part together with engines and boilers; steel material for 140 ft. of new fore end; joining section of 25 ft. was built in; Granite Dry Dock has extreme length of 787 ft.; width at coping 120 ft., width of entrance 88 ft., depth of water over center of sill at high water, ordinary spring tides 34 ft. 6 in.
Remarkable work at taikoo dockyard
Salvage, repairs and building, and joining up of S. S. Tijileboet near fore end; cut vessel through fore cross bunker and salved after part together with engines and boilers; steel material for 140 ft. of new fore end; joining section of 25 ft. was built in; Granite Dry Dock has extreme length of 787 ft.; width at coping 120 ft., width of entrance 88 ft., depth of water over center of sill at high water, ordinary spring tides 34 ft. 6 in.
Remarkable work at taikoo dockyard
Far Eastern Rev
Far Eastern Review ; 24
1928
4 pages
12 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 1994
Online Contents | 1999
|British Library Online Contents | 1999
|Engineering Index Backfile | 1926
|Engineering Index Backfile | 1911
|