A platform for research: civil engineering, architecture and urbanism
Ontario. Imposing stone school in Hamilton
Description of Cathedral Separate School, recently completed by Pigott Construction Co.; special care taken with masonry; cost $250,000; building is of reinforced concrete and steel frame faced with Credit Valley sandstone and trimmed with light buffIndiana limestone; comprises basement and two stories, which provide 10 classrooms, chemical laboratory, library, combined auditorium and gymnasium seating from 800 to 1000 people, and other smaller rooms.
Ontario. Imposing stone school in Hamilton
Description of Cathedral Separate School, recently completed by Pigott Construction Co.; special care taken with masonry; cost $250,000; building is of reinforced concrete and steel frame faced with Credit Valley sandstone and trimmed with light buffIndiana limestone; comprises basement and two stories, which provide 10 classrooms, chemical laboratory, library, combined auditorium and gymnasium seating from 800 to 1000 people, and other smaller rooms.
Ontario. Imposing stone school in Hamilton
Contract Rec
1928
2 pages
3 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Wiley | 1935
|The Port of Hamilton, Ontario, Canada
Online Contents | 2007
Neighbourhood artistic disaffiliation in Hamilton, Ontario, Canada
Online Contents | 2016
|Sackville Hill Seniors' Recreation Centre, Hamilton, Ontario
British Library Online Contents | 1996