A platform for research: civil engineering, architecture and urbanism
Transmountain highway construction in glacier national park
Length of project 12.4 mi.; goes from elevation 3537 at beginning to 6650 at Continental Divide on Logan Pass; excavation; snow fall; rubble masonry; surfacing; tunneling; work accomplished; personnel and equipment.
Transmountain highway construction in glacier national park
Length of project 12.4 mi.; goes from elevation 3537 at beginning to 6650 at Continental Divide on Logan Pass; excavation; snow fall; rubble masonry; surfacing; tunneling; work accomplished; personnel and equipment.
Transmountain highway construction in glacier national park
Contractors Engr. Monthly
Peters, W.G. (author)
1928
7 pages
19 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
The Transmountain Highway, Glacier National Park
Engineering Index Backfile | 1929
|Highway construction in rainier national park
Engineering Index Backfile | 1928
|Mt. Rainier National Park highway system developed through programmed construction
Engineering Index Backfile | 1934
|Mount carmel-zion national park highway
Engineering Index Backfile | 1930
|