A platform for research: civil engineering, architecture and urbanism
Local material saves road project
A 26.2-mi. problem; shipped-in material prohibitive; testing laboratory saves day; sandstone for surface aggregate; crushing and washing sand and stone; field tests satisfactory.
Local material saves road project
A 26.2-mi. problem; shipped-in material prohibitive; testing laboratory saves day; sandstone for surface aggregate; crushing and washing sand and stone; field tests satisfactory.
Local material saves road project
Contractors Engrs. Monthly
Logan, G.L. (author) / Willis, G.L. (author)
1928
3 pages
6 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 2011
Engineering Index Backfile | 1942
|Online Contents | 1997
Microtunneling saves San Diego sewer project
British Library Conference Proceedings | 1994
|It's a RAP: Recycled material saves money, helps create safer Illinois road
British Library Online Contents | 2011