A platform for research: civil engineering, architecture and urbanism
Five miles of concrete pavement laid by batch-box method
Notes on equipment, methods and forces used on State Aid job; one of several important state highway jobs under construction radiating from city of Chicago is that known as 22nd St. or Route 390; centerline of slab is divided by steel center strip; batching plant.
Five miles of concrete pavement laid by batch-box method
Notes on equipment, methods and forces used on State Aid job; one of several important state highway jobs under construction radiating from city of Chicago is that known as 22nd St. or Route 390; centerline of slab is divided by steel center strip; batching plant.
Five miles of concrete pavement laid by batch-box method
Mun. News
Municipal News ; 74
1928
3 pages
5 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
250 Miles of pavement laid in Ontario in 1929
Engineering Index Backfile | 1929
|More unreinforced concrete pavement being laid on New Jersey highways
Engineering Index Backfile | 1952
Cracks in hard asphalt pavement laid on concrete base
Engineering Index Backfile | 1940
|Black concrete pavement laid on street in residential section
Engineering Index Backfile | 1931
|New concrete block pavement laid on Albany Post Road, New York
Engineering Index Backfile | 1934