A platform for research: civil engineering, architecture and urbanism
Ten-mile link in 50-mile Galveston-Houston 20-ft. concrete road paved at rate of 1170-ft. day; methods of compacting; typical grading sections; pavement structure; construction plant and methods; details of paving slab. (See also - editorial comment on p. 457)
Ten-mile link in 50-mile Galveston-Houston 20-ft. concrete road paved at rate of 1170-ft. day; methods of compacting; typical grading sections; pavement structure; construction plant and methods; details of paving slab. (See also - editorial comment on p. 457)
Fast concrete roadbuilding under rush orders
Eng. News-Rec
Wise, A.J. (author)
Engineering News Record ; 101
1928
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Conference Proceedings | 1994
|ROADBUILDING MACHINE AND METHOD FOR OPERATING A ROADBUILDING MACHINE
European Patent Office | 2020
|Roadbuilding machine and method for operating a roadbuilding machine
European Patent Office | 2021
|Engineering Index Backfile | 1936
|Fast roadbuilding with concrete hauled four miles
Engineering Index Backfile | 1920