A platform for research: civil engineering, architecture and urbanism
No progress has been made beyond gravel surface type; long stretches of corduroy common; notable problem is crossing wide glacial rivers; in interior, completion of construction often requires 2 to 4 years; coast roads are constructed and maintained by U. S. Bureau of Public Roads. Abstract of address before Am. Road Congress.
No progress has been made beyond gravel surface type; long stretches of corduroy common; notable problem is crossing wide glacial rivers; in interior, completion of construction often requires 2 to 4 years; coast roads are constructed and maintained by U. S. Bureau of Public Roads. Abstract of address before Am. Road Congress.
Alaska roads
Pit Quarry
Williams, M.D. (author)
Pit and Quarry ; 15
1928
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1921
|Alaska highway -- Construction activities of public roads administration
Engineering Index Backfile | 1943
|Long-Term Evaluations of Insulated Roads and Airfields in Alaska
British Library Online Contents | 1995
|Using Geogrids to Limit Longitudinal Cracking of Roads in Interior Alaska
British Library Conference Proceedings | 1993
|