A platform for research: civil engineering, architecture and urbanism
Progress made on pavement construction during the year 1927
Detailed review of 1927 California state highway paving projects; high filler content mixture has been adopted as standard; results of laboratory analysis; portland-cement concrete; asphalt concrete; field comparisons; daily output averaged 277.1 tons in 1927; surface roughness, all types in 1927, 14.2 inches.
Progress made on pavement construction during the year 1927
Detailed review of 1927 California state highway paving projects; high filler content mixture has been adopted as standard; results of laboratory analysis; portland-cement concrete; asphalt concrete; field comparisons; daily output averaged 277.1 tons in 1927; surface roughness, all types in 1927, 14.2 inches.
Progress made on pavement construction during the year 1927
Calif. Highways
Withycombe, E. (author)
1928
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Progress in water-power utilization during the year 1927
Engineering Index Backfile | 1928
|Progress in Central highway of Cuba during 1927
Engineering Index Backfile | 1928
|1929 Progress in concrete pavement construction
Engineering Index Backfile | 1930
California pavement records and construction progress
Engineering Index Backfile | 1933
|Report on progress and records in pavement construction during 1944
Engineering Index Backfile | 1945
|