A platform for research: civil engineering, architecture and urbanism
Grand mere-Shawinigan track diversion
Principal features of construction of 8 miles of track for diversion near Shawinigan Falls, Que.; 40 Concrete culverts provide outlet for numerous springs and drain roadbed; total cost over $2,000,000.
Grand mere-Shawinigan track diversion
Principal features of construction of 8 miles of track for diversion near Shawinigan Falls, Que.; 40 Concrete culverts provide outlet for numerous springs and drain roadbed; total cost over $2,000,000.
Grand mere-Shawinigan track diversion
Can. Engr
Canadian Engineer ; 55
1928
3 pages
5 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Shawinigan hydroelectric complex: powerplant rehabilitation
British Library Conference Proceedings | 1993
|Academy St. Bernard Falls, Shawinigan, Que
Engineering Index Backfile | 1919
SPECIAL REPORT: Grand-Mère Replacement Project - Overcoming Challenges at Grand-Mère
Online Contents | 2003
|Overcoming Challenges at Grand-Mere
British Library Online Contents | 2003
|Shawinigan-2: Ahead of its Time and Still Running Strong
British Library Online Contents | 2011
|