A platform for research: civil engineering, architecture and urbanism
Grade crossing elimination in Westchester Co.
In planning 140 miles of new routes, nearly 200 highways crossing separations are provided for, 32 of which have been constructed and funds are available for six days; ideal arrangement at highway grade-crossing elimination provides access to roads at all four corners.
Grade crossing elimination in Westchester Co.
In planning 140 miles of new routes, nearly 200 highways crossing separations are provided for, 32 of which have been constructed and funds are available for six days; ideal arrangement at highway grade-crossing elimination provides access to roads at all four corners.
Grade crossing elimination in Westchester Co.
Pub. Works
Holleran, L.G. (author)
Public Works ; 59
1928
4 pages
7 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1928
Grade crossing elimination at Cleveland
Engineering Index Backfile | 1916
Grade-crossing elimination, whitehall, N. Y.
Engineering Index Backfile | 1934
|Rigid frame bridges in grade crossing elimination
Engineering Index Backfile | 1934
|Grade crossing elimination in New York city
Engineering Index Backfile | 1919
|