A platform for research: civil engineering, architecture and urbanism
Flin Flon railway being built with unusual speed
Building of railway from The Pas, in Manitoba, to Flin Flon mining property, distance 90 miles; bonus of $250,000, if line completed and trains running before Dec. 31, 1928; laying ties and rails on frozen ground for first 50 miles, to reach system of lakes navigable for scows and rafts, along shores of which runs final stretch of this line; three gravel pits opened up along first section ballasting and lifting roadbed pushed in both directions from each of these points.
Flin Flon railway being built with unusual speed
Building of railway from The Pas, in Manitoba, to Flin Flon mining property, distance 90 miles; bonus of $250,000, if line completed and trains running before Dec. 31, 1928; laying ties and rails on frozen ground for first 50 miles, to reach system of lakes navigable for scows and rafts, along shores of which runs final stretch of this line; three gravel pits opened up along first section ballasting and lifting roadbed pushed in both directions from each of these points.
Flin Flon railway being built with unusual speed
Eng. News-Rec
Engineering News Record ; 100
1928
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Water supply system and sewers at Flin Flon, Man.
Engineering Index Backfile | 1933
|Bernard Tschumi. Interface Flon Railway Station, Lausanne
Online Contents | 2001