A platform for research: civil engineering, architecture and urbanism
Construction works of the Port of Valencia
Construction work of enlarging port of Valencia budgeted at 36,000, 000 pesetas ($7,000,000) and contracted to Soc. Ibe rica de Construcciones y Obras; consists of three jetties, one wharf and one breakwater; describes making 260-ton hollow concrete blocks, placing same with large floating crane, and later filling with concrete; also other construction and equipment details; work complete in 1930 or 1931.
Construction works of the Port of Valencia
Construction work of enlarging port of Valencia budgeted at 36,000, 000 pesetas ($7,000,000) and contracted to Soc. Ibe rica de Construcciones y Obras; consists of three jetties, one wharf and one breakwater; describes making 260-ton hollow concrete blocks, placing same with large floating crane, and later filling with concrete; also other construction and equipment details; work complete in 1930 or 1931.
Construction works of the Port of Valencia
Las obras del puerto Valencia
Membrillera, F. (author)
1928
4 pages
6 Figs.
Article (Journal)
Spanish
© Metadata Copyright Elsevier B. V. All rights reserved.
The works at the port of Valencia, Spain
Engineering Index Backfile | 1912
Engineering Index Backfile | 1931
|Engineering Index Backfile | 1930
|Engineering Index Backfile | 1927
|Bascule bridge in the port of Valencia
British Library Conference Proceedings | 2004
|