A platform for research: civil engineering, architecture and urbanism
Unusually difficult foundation job recently completed for North American Cement Co.'s Acme plant near Catskill, N. Y., involving piles for cement storage tanks; open-end steel pipe driven to rock surface, then withdrawn, clay removed, and pipe redriven; at time of second driving, steel core placed in pipe, is driven to refusal, removed, and pipe filled with concrete.
Unusually difficult foundation job recently completed for North American Cement Co.'s Acme plant near Catskill, N. Y., involving piles for cement storage tanks; open-end steel pipe driven to rock surface, then withdrawn, clay removed, and pipe redriven; at time of second driving, steel core placed in pipe, is driven to refusal, removed, and pipe filled with concrete.
Cored-out pipe piles used in sticky clay
Eng. News-Rec
West, O.J. (author)
Engineering News Record ; 101
1928
2 pages
2 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Clay creates sticky foundation problem
Engineering Index Backfile | 1957
Behavior of Segmental Jacked Pipe Piles in Stiff Clay
ASCE | 2018
|Behavior of Segmental Jacked Pipe Piles in Stiff Clay
British Library Conference Proceedings | 2018
|Field investigation of base resistance of pipe piles in clay
British Library Online Contents | 2010
|European Patent Office | 2023
|