A platform for research: civil engineering, architecture and urbanism
Panama Canal needs more water
Without provision for greater water storage, Panama Canal cannot much longer take care of increased traffic; construction of dam at Alhajuela; by using Diesel-electric plant at Miraflores to take some of load off hydroelectric plant, it is estimated that 48 lockages per day will be possible.
Panama Canal needs more water
Without provision for greater water storage, Panama Canal cannot much longer take care of increased traffic; construction of dam at Alhajuela; by using Diesel-electric plant at Miraflores to take some of load off hydroelectric plant, it is estimated that 48 lockages per day will be possible.
Panama Canal needs more water
Sci. Am
Scientific American ; 138
1928
2 pages
4 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1936
|Engineering Index Backfile | 1932
|Online Contents | 2008
Online Contents | 2014
Online Contents | 2010