A platform for research: civil engineering, architecture and urbanism
Drilling and blasting at the Ojuela drainage tunnel
Driving of 5405 ft. drainage tunnel by Compania Minera de Penoles, S. A. at Ojuela, Durango, Mex., in 8 months was made possible by complete mechanization of all operations; driven through interbedded shales and limestones; mechanical loaders; ventilating equipment; standardization of drill round; handling explosives; best day's advance was 42 ft.
Drilling and blasting at the Ojuela drainage tunnel
Driving of 5405 ft. drainage tunnel by Compania Minera de Penoles, S. A. at Ojuela, Durango, Mex., in 8 months was made possible by complete mechanization of all operations; driven through interbedded shales and limestones; mechanical loaders; ventilating equipment; standardization of drill round; handling explosives; best day's advance was 42 ft.
Drilling and blasting at the Ojuela drainage tunnel
Explosives Engr
Hezzelwood, G.W. (author)
1928
4 pages
9 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Die 100jährige hölzerne Hängebrücke von Ojuela/Mexiko
IuD Bahn | 1995
|Die 100jährige hölzerne Hängebrücke in Ojuela-Mexiko
Online Contents | 1995
Online Contents | 1996
Online Contents | 1997