A platform for research: civil engineering, architecture and urbanism
The construction of the eleven east spans of the geultal viaduct
Details of construction of viaduct on railway section built during war between Aix-la-Chappelle and Tongres. Deals with part of work carried out by Good Hope Mining and Metallurgical Works, Inc., Bridge Department, Sterkrade. Viaduct was designed and partially constructed by Augsburg-Nurnberg Machine Works Corpn. (See also - no. 11 June 15 1921 p 294-299)
The construction of the eleven east spans of the geultal viaduct
Details of construction of viaduct on railway section built during war between Aix-la-Chappelle and Tongres. Deals with part of work carried out by Good Hope Mining and Metallurgical Works, Inc., Bridge Department, Sterkrade. Viaduct was designed and partially constructed by Augsburg-Nurnberg Machine Works Corpn. (See also - no. 11 June 15 1921 p 294-299)
The construction of the eleven east spans of the geultal viaduct
Der Bau der elf ostlichen Oeffnungen des Geultalviaduktes durch die Gutehoffnungshutte, A.-V. fur Bergbau und Huttenbetrieb, Abteilung Bruckenbau
Bauingenieur ; 2
1921
9 pages
28 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Single-column viaduct eliminates need for skew spans
Engineering Index Backfile | 1946
|Single-column viaduct eliminates need for skew spans
Engineering Index Backfile | 1946
|The new spans of the portage viaduct, Erie R. R.
Engineering Index Backfile | 1905
Overhead guided-transport track span, and viaduct formed by such spans
European Patent Office | 2020
|Overhead guided-transport track span, and viaduct formed by such spans
European Patent Office | 2019
|