A platform for research: civil engineering, architecture and urbanism
Build large earth-fill stadium by sheerboard method
Structure at University of Washington has concrete steps placed directly on earth formed to proper shape behind sheerboards. Concrete superstructure is to be built.
Build large earth-fill stadium by sheerboard method
Structure at University of Washington has concrete steps placed directly on earth formed to proper shape behind sheerboards. Concrete superstructure is to be built.
Build large earth-fill stadium by sheerboard method
Eng. News-Rec
1921
4 pages
10 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Sand fill makes marine stadium dry-land job
Engineering Index Backfile | 1951
Fast‐track design and build of a FIFA compliant stadium
Wiley | 2014
|Fast‐track design and build of a FIFA compliant stadium
Online Contents | 2014
|Online Contents | 1996
Unique method used to build Rock-fill dam
Engineering Index Backfile | 1916
|