A platform for research: civil engineering, architecture and urbanism
Repairing greene ave. Sewer, Brooklyn
About 2300 ft. of brick arch of 10 ft. sewer replaced by concrete in deep open cut work and about 750 ft. of defective brick arch for same 10-ft. sewer reinforced by concrete arch built inside old structure.
Repairing greene ave. Sewer, Brooklyn
About 2300 ft. of brick arch of 10 ft. sewer replaced by concrete in deep open cut work and about 750 ft. of defective brick arch for same 10-ft. sewer reinforced by concrete arch built inside old structure.
Repairing greene ave. Sewer, Brooklyn
Public Works
Public Works ; 49
1920
3 pages
3 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1906
|Sewer construction in Brooklyn
Engineering Index Backfile | 1905
Sewer construction in Brooklyn
Engineering Index Backfile | 1905
Flatbush, Brooklyn, relief sewer
Engineering Index Backfile | 1926
Engineering Index Backfile | 1920