A platform for research: civil engineering, architecture and urbanism
Recovery of flooded tunnels at Milwaukee
Settling shafts carried down adjacent lining, opened construction joints and flooded tunnels.
Recovery of flooded tunnels at Milwaukee
Settling shafts carried down adjacent lining, opened construction joints and flooded tunnels.
Recovery of flooded tunnels at Milwaukee
Eng. News-Rec
1921
5 pages
9 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Twin tunnels will drain and ventilate flooded peruvian mine
Engineering Index Backfile | 1964
Milwaukee. Milwaukee sewage disposal plant
Engineering Index Backfile | 1929
|Sewerage of Milwaukee, and the Milwaukee River flushing works
Engineering Index Backfile | 1893
|NTIS | 1968