A platform for research: civil engineering, architecture and urbanism
The new surface-plant for the united verde copper company
Brick and reinforced concrete buildings. Plant was designed to handle all repairs and current construction work arising from mining of 3000 tons per day underground, operation of 5 steam-shovels on surface and operation of railroad connecting mine with neighboring village.
The new surface-plant for the united verde copper company
Brick and reinforced concrete buildings. Plant was designed to handle all repairs and current construction work arising from mining of 3000 tons per day underground, operation of 5 steam-shovels on surface and operation of railroad connecting mine with neighboring village.
The new surface-plant for the united verde copper company
Min. Sci. Press
Parsons, L.A. (author)
1921
6 pages
8 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Timber preservation at the United Verde Extension Mining Company
Engineering Index Backfile | 1925
|Mining practice and methods at the United Verde extension mining company, Jerome, Ariz.
Engineering Index Backfile | 1930
|Mining methods and practices at United Verde Copper Mines, Jerome, Ariz
Engineering Index Backfile | 1931
|Online Contents | 1996
|Historical growth of the united verde smelting plant at Clarkdale, Arizona
Engineering Index Backfile | 1930
|