A platform for research: civil engineering, architecture and urbanism
Removal of the reuss bridge in lucerne
In order to build a new bridge it was necessary to move tracks during construction, for which purpose wooden trestles were built at 90-ft. distance down stream, and the five existing superstructures of bridge were moved to this newly constructed support. Details of removal work carried out by Lohle and Kern Corpn. are described.
Removal of the reuss bridge in lucerne
In order to build a new bridge it was necessary to move tracks during construction, for which purpose wooden trestles were built at 90-ft. distance down stream, and the five existing superstructures of bridge were moved to this newly constructed support. Details of removal work carried out by Lohle and Kern Corpn. are described.
Removal of the reuss bridge in lucerne
Die Verschiebung der Reussbrucke bei der Fluhmudie;hle in Luzern
Dreifus, Myrtill (author)
1920
4 pages
6 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Conference Proceedings | 2000
|New steel bridge over the Reuss at Mellingen
Engineering Index Backfile | 1929
|Timber Bridge over the Reuss River in Mellingen, Switzerland
British Library Online Contents | 2000
|Multitudes of Voigt - Reuss forks and Voigt - Christensen - Reuss tridents
DOAJ | 2020
|