A platform for research: civil engineering, architecture and urbanism
Reconstruction of the destroyed railroad bridge over the vistula river near Warsaw on the road to wilna
Details of temporary and final reconstruction of bridge necessitating raising of 2400 tons a height of 6 m. and new construction of 350 tons. All accessories, tools and building material were supplied from Germany and work was completed on final reconstruction in 81 days.
Reconstruction of the destroyed railroad bridge over the vistula river near Warsaw on the road to wilna
Details of temporary and final reconstruction of bridge necessitating raising of 2400 tons a height of 6 m. and new construction of 350 tons. All accessories, tools and building material were supplied from Germany and work was completed on final reconstruction in 81 days.
Reconstruction of the destroyed railroad bridge over the vistula river near Warsaw on the road to wilna
Wiederherstellung der zerstorten Eisenbahnbrucke uber die Weichsel bei Warschau in der Linie nach Wilna
1920
4 pages
6 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Bridge across the river Vistula at Warsaw
Engineering Index Backfile | 1918
Count Joseph Poniatowski bridge over the vistula in Warsaw
Engineering Index Backfile | 1930
Engineering Index Backfile | 1956
|Vistula River bridge, Torun, Poland
British Library Conference Proceedings | 1998
|