A platform for research: civil engineering, architecture and urbanism
The Susitna River bridge: Alaska government railway
Steel channel span 504 ft. avoids ice jams. Timber flanking spans. Concreting done at 12 deg. and riveting at 42 deg. below zero.
The Susitna River bridge: Alaska government railway
Steel channel span 504 ft. avoids ice jams. Timber flanking spans. Concreting done at 12 deg. and riveting at 42 deg. below zero.
The Susitna River bridge: Alaska government railway
Eng. News-Rec
1921
3 pages
4 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Susitna River Bridge, Alaska Railroad, U. S. A
Engineering Index Backfile | 1921
Erection of Hurricane Gulch arch bridge on Alaska government railway
Engineering Index Backfile | 1922
Timber bridge problems on the Alaska railway
Engineering Index Backfile | 1919