A platform for research: civil engineering, architecture and urbanism
Legal, hydraulic and construction problems of new addition to Boston water works; 25-mi tunnel joining older Wachusett system; description of spiral-lined shaft 260 ft deep, capable of diverting eventually two billion gal daily from Ware River; design and construction of two large earth dams having articulated concrete core walls sunk in 130 ft of ground water; tunnel construction, Quabbin aqueduct.
Legal, hydraulic and construction problems of new addition to Boston water works; 25-mi tunnel joining older Wachusett system; description of spiral-lined shaft 260 ft deep, capable of diverting eventually two billion gal daily from Ware River; design and construction of two large earth dams having articulated concrete core walls sunk in 130 ft of ground water; tunnel construction, Quabbin aqueduct.
Boston's new metropolitan water supply
Civ Eng (NY)
Winsor, F.E. (author)
1934
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 1994
|Boston's Regional Water Supply in 2020
British Library Conference Proceedings | 1995
|Climate Change Impacts on Boston's Water Supply
British Library Conference Proceedings | 1994
|Metropolitan Boston's Contaminant Monitoring System: Tuning and Planning for Response
British Library Conference Proceedings | 2014
|