A platform for research: civil engineering, architecture and urbanism
Low cost achieved on heavy-duty highway bridge
Construction of stillwater viaduct in Rhode Island, fourlane H-20 structure with eight T-beam approach spans and open-spandrel, three-rib arch of 80-ft span over Woonasquatucket River, on new Washington Highway that bypasses Providence; bridge completed at cost of $3.25 per sq ft of deck area, including roadway paving.
Low cost achieved on heavy-duty highway bridge
Construction of stillwater viaduct in Rhode Island, fourlane H-20 structure with eight T-beam approach spans and open-spandrel, three-rib arch of 80-ft span over Woonasquatucket River, on new Washington Highway that bypasses Providence; bridge completed at cost of $3.25 per sq ft of deck area, including roadway paving.
Low cost achieved on heavy-duty highway bridge
Eng News-Rec
Cargill, D.O. (author)
Engineering News-Record ; 112
1934
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1960
|Treated timber in heavy duty composite highway bridges
Engineering Index Backfile | 1940
|Demonstration Low-Cost Modular Composite Highway Bridge
British Library Conference Proceedings | 1996
|Preliminary bridge cost analysis for highway location
TIBKAT | 1965
|INCREASED COST EFFECTIVENESS AND DURABILITY ACHIEVED THROUGH NARROWED BOX GIRDER BRIDGE
British Library Conference Proceedings | 1999
|