A platform for research: civil engineering, architecture and urbanism
Construction of high-type bituminous pavements
Bureau of Public Roads study of construction methods and costs on 23 bituminous concrete highway projects, in 7 States, with aggregate length of 150 mi; typical procedure; plant modifications; time distribution and delay; efficiency of management; rates of production; loss of time due to weather; characteristics of typical dryers; pug mill operation; finishing operations; rolling requirements. (See also - n 4 Oct 1934 p 38-40; Pub Roads v 15 n 2 Apr 1934 p 29-53)
Construction of high-type bituminous pavements
Bureau of Public Roads study of construction methods and costs on 23 bituminous concrete highway projects, in 7 States, with aggregate length of 150 mi; typical procedure; plant modifications; time distribution and delay; efficiency of management; rates of production; loss of time due to weather; characteristics of typical dryers; pug mill operation; finishing operations; rolling requirements. (See also - n 4 Oct 1934 p 38-40; Pub Roads v 15 n 2 Apr 1934 p 29-53)
Construction of high-type bituminous pavements
Contractors Engrs Monthly
Rogers, C.F. (author)
1934
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction of high-type bituminous pavements
Engineering Index Backfile | 1934
|Engineering Index Backfile | 1936
|Engineering Index Backfile | 1916
|Factors in construction of bituminous pavements
Engineering Index Backfile | 1916
|Construction and destruction of bituminous pavements
Engineering Index Backfile | 1948
|