A platform for research: civil engineering, architecture and urbanism
Description of navigation improvements by Liao River Conservancy Board, in southern Manchuria, including huge diversion weir and lock and new river channel 14 mi long, having capacity of about 12,000 cu ft per sec and providing 7 1/2 ft of water at low stage, which required 2 3/4 million cu yd of excavation; details of flexible concrete mattress.
Description of navigation improvements by Liao River Conservancy Board, in southern Manchuria, including huge diversion weir and lock and new river channel 14 mi long, having capacity of about 12,000 cu ft per sec and providing 7 1/2 ft of water at low stage, which required 2 3/4 million cu yd of excavation; details of flexible concrete mattress.
Improving Liao river
Civ Eng (NY)
Okazaki, B. (author)
1934
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Conservancy works on Liao River, North China
Engineering Index Backfile | 1930
|Multi-scale evaluation of river health in Liao River Basin, China
Springer Verlag | 2011
|Analysis of Water Resources Carrying Capacity in Liao River Basin
British Library Conference Proceedings | 2012
|Dynamic fate modeling of γ-hexachlorocyclohexane in the lower reaches of the Liao River
Springer Verlag | 2007
|