A platform for research: civil engineering, architecture and urbanism
Galloway water power scheme
Details of Tongland portion of scheme; length of arch dam spans river and connects it with straight gravity dam; mass concrete used, no reinforcement being employed; gravity dam 200 ft long; details of gates, fish ladder, spillway, tunnel, power station, etc. (See also - n 3583 Sept 14 1934 p 267-70 and 280, n 3586 Oct 5 p 345-7 and 358, n 3589 Oct 26 p 429-32, n 3593 Nov 23 p 557-9; Engineer v 158 n 4109, 4110 and 4111 Oct 12 1934 p 366-8 and 362, Oct 19 p 381-2 and 388 and Oct 26 p 410-2; Concrete and Constr Eng v 29 n 2 and 3 Feb 1934 p 144-52 and Mar p 223-7)
Galloway water power scheme
Details of Tongland portion of scheme; length of arch dam spans river and connects it with straight gravity dam; mass concrete used, no reinforcement being employed; gravity dam 200 ft long; details of gates, fish ladder, spillway, tunnel, power station, etc. (See also - n 3583 Sept 14 1934 p 267-70 and 280, n 3586 Oct 5 p 345-7 and 358, n 3589 Oct 26 p 429-32, n 3593 Nov 23 p 557-9; Engineer v 158 n 4109, 4110 and 4111 Oct 12 1934 p 366-8 and 362, Oct 19 p 381-2 and 388 and Oct 26 p 410-2; Concrete and Constr Eng v 29 n 2 and 3 Feb 1934 p 144-52 and Mar p 223-7)
Galloway water power scheme
Engineering
Engineering ; 138
1934
Supp plates
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1934
Engineering Index Backfile | 1934
Hydro-electric scheme of Galloway water power company
Engineering Index Backfile | 1936
Hydro-electric scheme of Galloway water power company
Engineering Index Backfile | 1936
Galloway hydro-electric scheme
Engineering Index Backfile | 1936