A platform for research: civil engineering, architecture and urbanism
Shovels and trucks rush earthfill on Winooski flood-control dams
Construction of two earth-fill dams in Vermont totaling about 1,700,000 cu yd of fill, and of other structures entirely by CCC crews; construction was mechanized following winter season of hand labor; concrete diversion conduits built during cold weather.
Shovels and trucks rush earthfill on Winooski flood-control dams
Construction of two earth-fill dams in Vermont totaling about 1,700,000 cu yd of fill, and of other structures entirely by CCC crews; construction was mechanized following winter season of hand labor; concrete diversion conduits built during cold weather.
Shovels and trucks rush earthfill on Winooski flood-control dams
Eng News-Rec
Engineering News-Record ; 113
1934
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Building trio of earthfill dams
Engineering Index Backfile | 1949
Engineering Index Backfile | 1943
|Heightenning of Earthfill Saddle Dams of Barcena Reservoir for Extreme Flood Control
British Library Conference Proceedings | 1992
|Unsaturated Behaviour of Earthfill Dams
British Library Conference Proceedings | 1998
|Armoring Protection on Earthfill Dams
British Library Conference Proceedings | 1995
|