A platform for research: civil engineering, architecture and urbanism
$86,000,000 project for flood and navigation control on Missouri River, involving construction of reservoir of 19,500,000 acre-ft capacity with earth-fill dam 8800 ft long over 250 ft max height; excavation and materials; controlling normal and flood discharges; construction facilities.
$86,000,000 project for flood and navigation control on Missouri River, involving construction of reservoir of 19,500,000 acre-ft capacity with earth-fill dam 8800 ft long over 250 ft max height; excavation and materials; controlling normal and flood discharges; construction facilities.
Fort peck project
Civ Eng (NY)
Wyman, Jr., T. (author)
1934
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1934
|Engineering Index Backfile | 1935
|ASCE | 2021
|Engineering Index Backfile | 1942
|Engineering Index Backfile | 1940
|