A platform for research: civil engineering, architecture and urbanism
Lock concrete placed by pumping
Method of pumping 110,000 cu -yd of concrete for building locks 4 and 5 of upper Mississippi River slackwater navigation improvement, located 90 mi below St. Paul, Minn; plant layout; concreting procedure; performance records; diagrams of four pumping arrangements.
Lock concrete placed by pumping
Method of pumping 110,000 cu -yd of concrete for building locks 4 and 5 of upper Mississippi River slackwater navigation improvement, located 90 mi below St. Paul, Minn; plant layout; concreting procedure; performance records; diagrams of four pumping arrangements.
Lock concrete placed by pumping
Eng News-Rec
Engineering News-Record ; 112
1934
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Air-placed concrete for renovation
Engineering Index Backfile | 1949
|Grout composition for pre-placed aggregate concrete and pre-placed aggregate concrete using the same
European Patent Office | 2019
|Engineering Index Backfile | 1915
High-Performance concrete placed under water
Tema Archive | 1997
|Concrete placed off trestle at Folsom
Engineering Index Backfile | 1953