A platform for research: civil engineering, architecture and urbanism
Four comparable buildings reveal trend of costs since 1928
Wire variations in costs and specifications found in analyzing similar university classroom units built during last 7 yr; cubic-foot costs on present construction are 40% lower than those of 1928 despite more elaborate finishing.
Four comparable buildings reveal trend of costs since 1928
Wire variations in costs and specifications found in analyzing similar university classroom units built during last 7 yr; cubic-foot costs on present construction are 40% lower than those of 1928 despite more elaborate finishing.
Four comparable buildings reveal trend of costs since 1928
Eng News-Rec
Knox, F.J. (author)
Engineering News-Record ; 113
1934
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Highway transportation since 1928
Engineering Index Backfile | 1938
|Highway transportation since 1928
Engineering Index Backfile | 1938
|Trend of housing in Scotland since 1919
Engineering Index Backfile | 1936
|State road construction and maintenance costs per mile (1928)
Engineering Index Backfile | 1929