A platform for research: civil engineering, architecture and urbanism
Three kinds of estimates for determining cost of industrial buildings are discussed; cubic-feet estimate, square-feet estimate, and quantity survey; items which should be considered are foundation conditions, floor loads and column spacing, story heights and size and shape of building.
Three kinds of estimates for determining cost of industrial buildings are discussed; cubic-feet estimate, square-feet estimate, and quantity survey; items which should be considered are foundation conditions, floor loads and column spacing, story heights and size and shape of building.
Estimating the cost of industrial buildings
Arch. Forum
Fox, H.H. (author)
Architectural Forum ; 51
1929
4 pages
4 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Cost of lighting industrial buildings
Engineering Index Backfile | 1929
|Cost of concrete industrial buildings
Engineering Index Backfile | 1968
|FM COST TRENDS Cost comparison between industrial buildings
British Library Online Contents | 2015
The cost of lighting industrial buildings
Engineering Index Backfile | 1929
|