A platform for research: civil engineering, architecture and urbanism
Radial gates and hoists
Invitation for bids, schedules, specifications and drawings for Echo Dam, Weber River Division Salt Lake Basin project, Utah, and for headworks and diversion structures Main Canal, Gravity Extension Division of Minidoka Project, Idaho.
Radial gates and hoists
Invitation for bids, schedules, specifications and drawings for Echo Dam, Weber River Division Salt Lake Basin project, Utah, and for headworks and diversion structures Main Canal, Gravity Extension Division of Minidoka Project, Idaho.
Radial gates and hoists
U. S. Bur. Reclamation -- Specifications
1929
12 pages
12 Supp. plates
Report
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Hoists for penstock coaster gates for Grand Coulee Dam
Engineering Index Backfile | 1941
Engineering Index Backfile | 1934
Load Testing of Bureau of Reclamation Radial Gate Hoists
NTIS | 1998
|Fixed-wheel gates and hydraulic gate hoists for diversion tunnel at Shasta Dam
Engineering Index Backfile | 1941
Online Contents | 2015
|