A platform for research: civil engineering, architecture and urbanism
New incinerator of city of Zurich, Switzerland
New installation was built by Bamag-Meguin-Corp. in Berlin; output is 300 tons in 24 hours; details of unloading bin, inclined conveyors, incinerators, slag and slag transport, flue-dust removal, and heat utilization.
New incinerator of city of Zurich, Switzerland
New installation was built by Bamag-Meguin-Corp. in Berlin; output is 300 tons in 24 hours; details of unloading bin, inclined conveyors, incinerators, slag and slag transport, flue-dust removal, and heat utilization.
New incinerator of city of Zurich, Switzerland
Neue Muellverbrennungsanlage der Stadt Zuerich
Koschmieder, H. (author)
Waerme ; 52
1929
4 pages
6 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Online Contents | 2008
|British Library Online Contents | 2001
|Urban housing, Zurich, Switzerland
British Library Online Contents | 1999
|Prime Tower, Zurich, Switzerland
British Library Online Contents | 2010
|Lunch complex, Zurich, Switzerland
British Library Online Contents | 2003
|