A platform for research: civil engineering, architecture and urbanism
Electrical subsoil exploration and the civil engineer
Foundation conditions at dam site investigated by method of equipotential curves which checked closely with results of borings.
Electrical subsoil exploration and the civil engineer
Foundation conditions at dam site investigated by method of equipotential curves which checked closely with results of borings.
Electrical subsoil exploration and the civil engineer
Eng. News-Rec
Crosby, I.B. (author)
Engineering News Record ; 102
1929
4 pages
3 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
European Patent Office | 2019
|Civil Engineer - the `People's Engineer'
British Library Online Contents | 2012
Engineering Index Backfile | 1940
|TIBKAT | 1.1960 - 41.2004,2; damit Ersch. eingest.
Engineering Index Backfile | 1928
|