A platform for research: civil engineering, architecture and urbanism
Lake shore road track construction
Toronto transportation commission builds new double track paved railway from Toronto City limits at Humber to Brown's line, Long Branch, distance of 5 mi., at cost of $1,250,000; highway also widened.
Lake shore road track construction
Toronto transportation commission builds new double track paved railway from Toronto City limits at Humber to Brown's line, Long Branch, distance of 5 mi., at cost of $1,250,000; highway also widened.
Lake shore road track construction
Can. Engr
Canadian Engineer ; 56
1929
2 pages
5 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Temporary trestle construction on the lake shore
Engineering Index Backfile | 1914
Engineering Index Backfile | 1929
|Engineering Index Backfile | 1929
|Engineering Index Backfile | 1897
Double-track bridge across the calumet river -- Chicago, lake shore and eastern railway
Engineering Index Backfile | 1897