A platform for research: civil engineering, architecture and urbanism
Dredging and sounding methods
Results of questionnaire of committee of American Railway Engineering Assn.; allowance for swell in scow measurement dredge work; allowable over-depth in dredging operations to obtain desired operating depth; usual slopes taken in deep waterways; sounding methods in river and tidal waters. (See also Eng. and Contracting vol. 68, no. 4, Apr. 1929 p. 150)
Dredging and sounding methods
Results of questionnaire of committee of American Railway Engineering Assn.; allowance for swell in scow measurement dredge work; allowable over-depth in dredging operations to obtain desired operating depth; usual slopes taken in deep waterways; sounding methods in river and tidal waters. (See also Eng. and Contracting vol. 68, no. 4, Apr. 1929 p. 150)
Dredging and sounding methods
Contract Rec
Contract Record ; 43
1929
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1929
Modern methods of deep sea sounding and dredging
Engineering Index Backfile | 1900
|British Library Conference Proceedings | 2005
|DREDGING - Dredging contractors
Online Contents | 1999
DREDGING - Dredging contractors
Online Contents | 2000