A platform for research: civil engineering, architecture and urbanism
H. M. Dockyard, Devonport. Widening of N. 5 basin-entrance
Description of dockyard and details of widening of direct entrance to closed basin no. 5, from 95 ft. to 125 ft.; cost data; total cost of construction 131,000 pounds sterling instead of 230,000 pounds representing estimate cost.
H. M. Dockyard, Devonport. Widening of N. 5 basin-entrance
Description of dockyard and details of widening of direct entrance to closed basin no. 5, from 95 ft. to 125 ft.; cost data; total cost of construction 131,000 pounds sterling instead of 230,000 pounds representing estimate cost.
H. M. Dockyard, Devonport. Widening of N. 5 basin-entrance
Instn. Civil Engrs. -- Minutes Proc
Jacob, G.S. (author)
1929
16 pages
10 Figs. on Supp. plate
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
H. M. Dockyard, Devonport, widening of N.5 basin-entrance
Engineering Index Backfile | 1930
|British Library Online Contents | 1999
|Online Contents | 1999
|Low Level Refuelling Facility, Devonport Royal Dockyard, Plymouth
British Library Online Contents | 2000
how safety is managed at Devonport Royal Dockyard
British Library Online Contents | 2001
|