A platform for research: civil engineering, architecture and urbanism
The new storage facilities of the Pawtucket water works
Pawtucket, R. I., has recently spent approximately $1,000,000 on new storage facilities on Abbott Run watershed; topography of drainage basin; testing foundations for Arnolds Mills earth-fill dam and dike 2,900 ft. long, with maximum height of 36 ft.; main construction methods; grouting; embankment pavement; raising of railroad embankment; reforestation.
The new storage facilities of the Pawtucket water works
Pawtucket, R. I., has recently spent approximately $1,000,000 on new storage facilities on Abbott Run watershed; topography of drainage basin; testing foundations for Arnolds Mills earth-fill dam and dike 2,900 ft. long, with maximum height of 36 ft.; main construction methods; grouting; embankment pavement; raising of railroad embankment; reforestation.
The new storage facilities of the Pawtucket water works
New England Water Works Assn. -- Jl
Williams, F.C. (author)
1929
20 pages
6 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 1975
|