A platform for research: civil engineering, architecture and urbanism
Dispatch marks construction of new dam at Alcove
Earth dam to create reservoir of 1400 acres for Albany water supply will be about 95 ft. high and 2177 ft. long; top width 15 ft., inside slope 1 on 3, and downstream slope 1 on 2 1/2, reinforced concrete core wall varying from minimum of 4 ft. to maximum of 8 ft. 2 in. in thickness; sequence of operations; crusher and concreting plant.
Dispatch marks construction of new dam at Alcove
Earth dam to create reservoir of 1400 acres for Albany water supply will be about 95 ft. high and 2177 ft. long; top width 15 ft., inside slope 1 on 3, and downstream slope 1 on 2 1/2, reinforced concrete core wall varying from minimum of 4 ft. to maximum of 8 ft. 2 in. in thickness; sequence of operations; crusher and concreting plant.
Dispatch marks construction of new dam at Alcove
Contractors Engrs. Monthly
Contractors, N.Y. (author)
1929
3 pages
3 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Online Contents | 2003