A platform for research: civil engineering, architecture and urbanism
Design, control and production on Sun River project in Rocky Mountains of Montana; construction of concrete arch dam having maximum height of 190 ft. and crest length of 1000 ft.; field laboratory; design of mix; concrete is mixed 1 1/4 min. in 2-yd. mixers at central plant, hauled to dam in 2-yd. cars and distributed to place of deposit by means of towers and chutes. Read before Colorado section of Am. Soc. Civil Engrs.
Design, control and production on Sun River project in Rocky Mountains of Montana; construction of concrete arch dam having maximum height of 190 ft. and crest length of 1000 ft.; field laboratory; design of mix; concrete is mixed 1 1/4 min. in 2-yd. mixers at central plant, hauled to dam in 2-yd. cars and distributed to place of deposit by means of towers and chutes. Read before Colorado section of Am. Soc. Civil Engrs.
Concrete work at Gibson dam
Eng. Contracting
Lowry, R. (author)
1929
3 pages
8 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 2009
|British Library Online Contents | 2009
Automatic batchers add ice to concrete mix for fort gibson dam
Engineering Index Backfile | 1949
|Automatic batchers add ice to concrete mix for fort gibson dam
Engineering Index Backfile | 1949
|Uplift pressure measured at gibson dam
Engineering Index Backfile | 1932
|