A platform for research: civil engineering, architecture and urbanism
British standard specifications demand 10 per cent or less residue on sieve 32,400 meshes per sq. in.; determining per cent residue at varying speed of flow.
British standard specifications demand 10 per cent or less residue on sieve 32,400 meshes per sq. in.; determining per cent residue at varying speed of flow.
Tests for fineness of Portland cement
Cement Cement Manufacture
Dickson, S. (author)
1929
4 pages
2 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1935
|Determining fineness of portland cement
Engineering Index Backfile | 1944
Measuring fineness of Portland cement
Engineering Index Backfile | 1941
Fineness and sieving of Portland cement
Engineering Index Backfile | 1932
|