A platform for research: civil engineering, architecture and urbanism
Canal excavation on the Sukkur barrage project
Information on Sukkur barrage project in basin of lower course of Indus river, commanding irrigable area of 6,500,000 acres comprising 1600 mi. of main canal and 4622 mi. of tributaries; how 35 Bucyrus-Erie and 11 Ruston and Hornsby draglines handled 120,000,000 cu. yd. of canal excavation.
Canal excavation on the Sukkur barrage project
Information on Sukkur barrage project in basin of lower course of Indus river, commanding irrigable area of 6,500,000 acres comprising 1600 mi. of main canal and 4622 mi. of tributaries; how 35 Bucyrus-Erie and 11 Ruston and Hornsby draglines handled 120,000,000 cu. yd. of canal excavation.
Canal excavation on the Sukkur barrage project
Excavating Engr
Excavating Engineer ; 23
1929
14 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Sukkur barrage project: Sind (II)
Engineering Index Backfile | 1932
Engineering Index Backfile | 1928
Engineering Index Backfile | 1922
Sukkur irrigation project: sind
Engineering Index Backfile | 1932
Some lessons from O&M experience of Sukkur barrage (Sind-Pak)
British Library Online Contents | 1994
|