A platform for research: civil engineering, architecture and urbanism
Short description of construction methods; foundation excavation; sinking of concrete pneumatic caissons, maximum dimensions 12.3 m. by 23.5 m.
Short description of construction methods; foundation excavation; sinking of concrete pneumatic caissons, maximum dimensions 12.3 m. by 23.5 m.
Construction of Neiderfinow Boat Lift
Vom bau des Schiffshebewerkes Neiderfinow
Seidel, H. (author)
VDI Zeitschrift ; 73
1929
2 pages
4 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1930
|Anderton Boat Lift restoration
British Library Online Contents | 2003
|