A platform for research: civil engineering, architecture and urbanism
Bridge over the Murray river at the Hume reservoir, Bethanga, Victoria
Design and construction of steel truss bridge of nine spans, each 265 ft. long, supported on concrete piers 100 ft. high; plan of moving forms; construction of pier columns; jacks; concreting plant.
Bridge over the Murray river at the Hume reservoir, Bethanga, Victoria
Design and construction of steel truss bridge of nine spans, each 265 ft. long, supported on concrete piers 100 ft. high; plan of moving forms; construction of pier columns; jacks; concreting plant.
Bridge over the Murray river at the Hume reservoir, Bethanga, Victoria
Commonwealth Engr
Shaw, E.D. (author)
1929
6 pages
7 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
The hume reservoir on the Murray river
Engineering Index Backfile | 1928
Engineering Index Backfile | 1935
Bridge over the murray river at Yarrawonga
Engineering Index Backfile | 1928
|The Victoria bridge over the River dee
Engineering Index Backfile | 1897
Road bridge over Loddon river at Eddington, Victoria
Engineering Index Backfile | 1930
|