A platform for research: civil engineering, architecture and urbanism
San Francisco bay toll bridge
Seven-mile precast concrete bridge completed in 14 1/2 months, or 106 days ahead of schedule; toll rates.
San Francisco bay toll bridge
Seven-mile precast concrete bridge completed in 14 1/2 months, or 106 days ahead of schedule; toll rates.
San Francisco bay toll bridge
West. Construction News
1929
2 pages
3 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1928
|Engineering Index Backfile | 1928
|San Francisco bay toll bridge progressing rapidly
Engineering Index Backfile | 1928
Highway lighting installation for San Francisco bay toll bridge
Engineering Index Backfile | 1929
|Toll bridge authority directs construction of two new San Francisco Bay crossings
Engineering Index Backfile | 1948
|