A platform for research: civil engineering, architecture and urbanism
Bridge contractor uses floating machine to cut underwater piles
Methods of constructing Washington Bridge, Providence, R. I.; bridge consists of double-leaf bascule span 150 ft. long and 12 concrete-arch spans, 89 to 105 ft. long; bridge piers are founded on timber piles; details of mechanical underwater pile cutter; steel truss centering used in construction of river arches are supported on false sand jacks.
Bridge contractor uses floating machine to cut underwater piles
Methods of constructing Washington Bridge, Providence, R. I.; bridge consists of double-leaf bascule span 150 ft. long and 12 concrete-arch spans, 89 to 105 ft. long; bridge piers are founded on timber piles; details of mechanical underwater pile cutter; steel truss centering used in construction of river arches are supported on false sand jacks.
Bridge contractor uses floating machine to cut underwater piles
Construction Methods
Construction Methods ; 11
1929
4 pages
10 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Contractor-built rig cuts timber piles underwater
Engineering Index Backfile | 1963
Contractor uses oil-well bit to install precast piles
Engineering Index Backfile | 1965
NEW DIGS: New Jersey contractor uses fresh approach for driving piles
British Library Online Contents | 2007
Contractor places floating bridge anchors, gets back on schedule
Engineering Index Backfile | 1959
|Floating piling platform for underwater cast-in-situ bored piles
European Patent Office | 2024
|