A platform for research: civil engineering, architecture and urbanism
Features of bridge under construction across River Yarra, between Spencer Street, Melbourne, and Clarendon Street, South Melbourne; structure will be of three spans with cantilever plate girders, 130 ft. center span and 95 ft. abutment spans; piers and abutments are concrete faced with blue stone; earlier commencement of work made possible by adoption of day labor; use of timber cylinders and circular cofferdams; placing of concrete under-water in depths up to 85 ft.
Features of bridge under construction across River Yarra, between Spencer Street, Melbourne, and Clarendon Street, South Melbourne; structure will be of three spans with cantilever plate girders, 130 ft. center span and 95 ft. abutment spans; piers and abutments are concrete faced with blue stone; earlier commencement of work made possible by adoption of day labor; use of timber cylinders and circular cofferdams; placing of concrete under-water in depths up to 85 ft.
Spencer street bridge
Instn. Engrs. Australia -- Jl
Chapman, W.D. (author)
1929
10 pages
12 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1929
|Spencer street bridge -- Design
Engineering Index Backfile | 1930
|Foundation work for spencer street bridge, Melbourne
Engineering Index Backfile | 1928
|Engineering Index Backfile | 1962
Engineering Index Backfile | 1962