A platform for research: civil engineering, architecture and urbanism
Pneumatic caissons sunk 110 ft. For Vicksburg bridge
New Mississippi Railway and road bridge required caisson work under 52-lb. air pressure; swift current demanded unique anchor construction and timber mats to prevent scour; one caisson used as diving bell to level up reef.
Pneumatic caissons sunk 110 ft. For Vicksburg bridge
New Mississippi Railway and road bridge required caisson work under 52-lb. air pressure; swift current demanded unique anchor construction and timber mats to prevent scour; one caisson used as diving bell to level up reef.
Pneumatic caissons sunk 110 ft. For Vicksburg bridge
Eng. News-Rec
Stowell, R.G. (author)
Engineering News Record ; 103
1929
4 pages
6 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Pneumatic caissons sunk for core wall of Quabbin dam
Engineering Index Backfile | 1936
Caissons sunk in deep water for Mississippi bridge piers
Engineering Index Backfile | 1940
Caissons sunk by rotating steel shells
Engineering Index Backfile | 1938
Caissons sunk by rotating steel shells
Engineering Index Backfile | 1938
Concrete caissons for Danish bridge piers launched, capsized and sunk
Engineering Index Backfile | 1933